Sign in

ํšŒ์‚ฌ ๊ฐœ์š”

ํšŒ์‚ฌ ์•จ๋ฒ”

๊ธฐ๋ณธ ์ •๋ณด

์ œํ’ˆ ์šฉ๋Ÿ‰

์ƒ์‚ฐ ํ๋ฆ„

ironing the woven raffia
the woven raffia panel is folded in four when we receive them from the weavers, so the first step of the process is to iron it to remove the pleat
woven raffia pannel
this is the woven raffia pannel when opened, this is also called RABANE
pack of rabane
this is the way we receive the RABANE, packed in 100 panels to make it easy for the transport.

์ƒ์‚ฐ ์žฅ๋น„

์ด๋ฆ„
์•„๋‹ˆ์š”
์ˆ˜๋Ÿ‰
๊ฒ€์ฆ๋จ
iron
steam iron
5
sewing machine
JUKI-JACK-BROTHER-
50
๊ฒ€์ฆ๋จ

๊ณต์žฅ ์ •๋ณด

๊ณต์žฅ ๊ทœ๋ชจ
Below 1,000 square meters
๊ณต์žฅ ๊ตญ๊ฐ€/์ง€์—ญ
lot 161 T BIS Ambatofotsy Sabotsy Namehana Antananarivo 103
์ƒ์‚ฐ ๋ผ์ธ ์ˆ˜
Above 10
๊ณ„์•ฝ ์ œ์กฐ
OEM Service Offered
์—ฐ๊ฐ„ ์ถœ๋ ฅ ๊ฐ’
Below US$1 Million

์ƒ์‚ฐ ๋ผ์ธ

์ƒ์‚ฐ ๋ผ์ธ
๊ด€๋ฆฌ์ž
์šด์˜์ž ์ˆ˜
์ธ๋ผ์ธ QC/QA ์ˆ˜
๊ฒ€์ฆ๋จ
assembly line
5
15
20
๊ฒ€์ฆ๋จ

ํ’ˆ์งˆ ๊ด€๋ฆฌ

ํ’ˆ์งˆ ๊ด€๋ฆฌ ์ ˆ์ฐจ

cleaning
the bags need to be cleaned : remove the threads ravelling, insert the cord for the drawstring closure
first quality control
first control is to check if accessories are complete such as the cord and if handles are symetric
final quality control
final control is to check if all is ok before the packaging process

R&D ์—ญ๋Ÿ‰

์—ฐ๊ตฌ ๋ฐ ๊ฐœ๋ฐœ

5 - 10 People